Integration
Sitejar Trello integration
The Sitejar Trello integration turns website scan findings into Trello cards in the list you choose, one card per finding and never a duplicate: sending a finding again adds a comment to the card it already has. Each card carries the rule, the severity, the pages it was found on and the suggested fix, its state shows on the finding in Sitejar, and only a scan that no longer detects the problem marks it fixed.
On Agency and above.
What the Sitejar Trello integration does
Sitejar scans a site in a real browser for accessibility (WCAG 2.1 AA), security, privacy, deceptive design, technical quality and SEO, and tracks each problem from scan to scan. This integration carries those findings to where your team plans its work, written so whoever picks one up can start without opening Sitejar.
- One card per finding. Sending it again adds a comment instead of a second card.
- The card's state, read back from Trello, shows on the finding.
- A default list for the workspace, and its own list for any site that needs one.
- Whole reports in one send: one card for the report with a "Findings" checklist that links each finding's card.
Who the Trello integration is for
Teams that already plan their work in Trello and want website problems in the same queue as everything else. If your team runs a simple Trello board for the website, findings arrive as cards in the list you choose, usually a Backlog or To do list. It suits agencies handing client fixes to a delivery team, and developers who would rather get a card with a selector and a fix than a PDF.
Send accessibility issues to Trello
Accessibility is the most common reason teams send findings, but any finding can go: a missing security header, a tracker that loads before consent, a broken link.
Turn a new scan into a backlog
Send a whole report and Sitejar creates one card for the report with a "Findings" checklist that links each finding's card, most severe first, filtered by severity and with or without Needs review findings. Send the same report again later and only the findings not yet sent are added.
Send just what fits this sprint
Select a handful of findings on the Findings page, or open one finding, and send only those. The rest stay in Sitejar until you are ready.
Keep each client's work in its own list
Give a site its own destination, and its findings go to that list while everything else goes to the default. On Agency Plus, a client can have a destination too: a site's own wins over its client's, and its client's over the default.
How to connect Trello to Sitejar
- Sign in to Sitejar as an Owner or Admin of the workspace and open Settings, then Integrations.
- On the Trello card, choose "Connect Trello". If your plan does not include Trello, the card says "Not on your plan" instead.
- Trello asks you to allow Sitejar to read and write your boards. Allow it.
- Trello sends you back to the Integrations page, which finishes the connection. Trello hands the token back in the part of the address that never reaches a server, and the page passes it to Sitejar in a request body, so it never appears in a url Sitejar logs.
- Back in Sitejar, the card says "Connected to" followed by your Trello full name, or your username when the profile has no name. Under "Tasks go to", choose the list new cards go to by default.
- Optional: under "Give a site its own destination", pick a site and a list, then choose "Add".
A workspace has one Trello connection, and connecting again replaces it.
How to send findings to Trello
Anyone whose role can manage findings (Owner, Admin or Editor) can send them, three ways:
- On the Findings page, select findings and choose "Send to Trello" in the bulk actions bar, or choose "Create tasks" and pick Trello under "Send to". Up to 50 at a time.
- On one finding, use "Send to Trello" in its Task section, which then links to the card.
- On a report, choose "Send report to Trello" in the Next steps panel ("Send report to a task tool" when more than one is connected), pick the severities, and send. Up to 100 cards at a time.
What Sitejar sends to Trello, and what it stores
What a Trello card from Sitejar contains
The title names the dimension, the severity, the rule, the page count and the site: [Accessibility][High] Form field missing a label (12 pages) | example.com.
The body carries the confidence label (Confirmed, Likely or Needs review), how many instances on how many pages and the scan date, a CSS selector, the WCAG success criterion where one applies, the first 20 page urls, the suggested fix and its code when one exists (or "No AI fix yet"), and a link back to the finding. It never contains evidence captured from your pages or their content. Trello renders card descriptions as Markdown, so the selector and any suggested code read as code.
Permissions Sitejar asks for in Trello
Sitejar asks Trello for read and write access, through Trello's API key and user token flow, with a token that does not expire on its own. Sitejar uses it to list your open boards and their lists, create cards, comment, add a checklist to a report card, read a card's state and, if you turn it on, mark its due date complete.
What Sitejar stores about your Trello connection
Sitejar stores the Trello user token, your Trello full name, or your username when the profile has no name for the card, the destinations you pick, and the last error Trello returned. Credentials are encrypted with AES-256-GCM and never sent to your browser. For each card it created, Sitejar keeps the card's id, url, last state and when it last checked. The one piece of personal data Sitejar keeps from Trello is the name on the account that approved access, shown on the card so you know whose access it is.
Disconnecting empties the stored credentials at once, and the cards already created stay in Trello. To revoke the grant on the Trello side too, remove Sitejar in Trello's own settings.
What happens in Trello after the next scan
The sync runs one way: a scan can move a card, but closing a card never marks a finding fixed. Only a scan that no longer detects the problem does, so a card closed by mistake or before the deploy cannot flatter your scores.
When a linked card is shown in Sitejar, Sitejar reads its state from Trello, at most once every 10 minutes. The finding shows Complete when the card is archived or its due date is marked complete, and Open otherwise. If Trello answers with an error, the last known state stays. Cards deleted in Trello show as Removed, and one closed while the latest scan still finds the problem shows "Reopened: closed in the tool, still detected in the latest scan."
On Business and above, each completed scan adds one comment to every linked card: "Still detected in the Sitejar scan of 3 November 2026." or "Not detected in the Sitejar scan of 3 November 2026. A scan, not this task, confirms a fix."
On Agency Plus, you can turn on "Move tasks after each scan" on the Trello card. Cards whose finding is not detected then move to complete, by marking its due date complete, and those whose finding comes back move to not complete, by clearing that mark (Sitejar never archives a card or moves it to another list). It is off until you turn it on.
Which plans include the Trello integration, and its limits
Trello is on Agency and above. Whole-report sends and after-scan comments are on Business and above, and automatic moves and per-client destinations are on Agency Plus. To see everything each plan includes, compare plans on the pricing page.
- One Trello connection per workspace.
- Up to 50 findings per send from the findings list, and up to 100 cards per whole-report send. Send the report again for the rest.
- Lists are offered as Board / List from your first 50 open boards.
- The Trello token does not expire. Disconnecting in Sitejar deletes Sitejar's copy; revoke the token itself from your Trello account settings.
- Dedupe belongs to the connection: findings sent through a connection you have since replaced go out as new cards.
Troubleshooting the Trello integration
"That connection link expired or was already used"
The link Trello sends you back with works once, within 10 minutes of choosing Connect. Choose "Connect Trello" again and finish without a long pause.
"Choose where Trello tasks go for this site first"
No destination applies to that site yet. Choose a default under "Tasks go to", or give the site its own.
The card shows "Last attempt" with an error from Trello
That is what Trello answered on the last call. "Trello answered 401" or "403" usually means the access was revoked or the connected account lost access to that list: connect again, or choose another list. "Trello answered 404" usually means it was deleted.
"Trello did not finish connecting"
The Integrations page did not receive the token Trello hands back, often because the page was closed or reloaded on the way. Choose "Connect Trello" again and let Trello return you to the page.
A card shows Complete but the finding is still detected
Sitejar treats an archived card, or one whose due date is marked complete, as closed. The finding still counts until a scan stops detecting it, and the finding says it was reopened if the latest scan still finds the problem.
Trello integration FAQ
Does sending a finding to Trello twice create two cards?
No. Sitejar links each finding to the card it created. Sending the same finding again through the same connection adds a dated comment with its current details to that card.
Does closing the Trello card mark the finding fixed in Sitejar?
No. Sitejar shows the card's state, but a finding counts as fixed only when a scan no longer detects the problem. If the card is closed while the latest scan still finds it, the finding says it was reopened.
What does Sitejar store from Trello?
The credentials for the connection, encrypted with AES-256-GCM, your Trello full name, or your username when the profile has no name, and for each card it created, its id, url and last known state. Disconnecting deletes the credentials at once.
Which plan do I need for the Trello integration?
Trello is on Agency and above. Whole-report sends and after-scan comments are on Business and above, and moving cards automatically after a scan is on Agency Plus.
Does Sitejar move Trello cards between lists?
No. With automatic moves turned on, Sitejar marks a card's due date complete when its finding is no longer detected, and clears that mark if the finding comes back. It never archives a card or moves it to another list.
Related integrations
Last updated . Trello and the Trello logo are trademarks of Atlassian. Sitejar is not affiliated with or endorsed by Atlassian.